How much does the incumbent's advantage count when a contract is re-tendered?

The incumbent's advantage comes from what it knows and what it has already paid for: real volumes, true costs, the buyer's complaints, and staff and vehicles already in place. No rule hands it the contract. A challenger has to rebuild those figures before setting a price. VIDI by EE Partner estimates the expected competition from similar closed tenders.

What the current supplier knows that you don't

Running a service for years gives a supplier no right to keep it. It does give edges a challenger has to buy or guess, and they weigh differently in every tender.

EdgeWhy it mattersWhat a challenger does
Real volumesThe tender estimates; the incumbent knows what it invoicedClarification question on past figures, payment records where published
Costs already paidPremises, equipment and trained staff are not a new costCounts start-up costs separately, spread over the term
The buyerIt knows what was criticised and what goes down wellReads minutes, complaints, penalty notices, local news
StaffToday's team knows the sites, hours and usersChecks whether the tender expects current staff to be taken on, with an adviser
The incumbent's edge and how a challenger narrows it

The flip side: the incumbent carries the problems the buyer remembers, and may be tied to a price set years ago.

Will the contract really go back out to tender, and when?

First, check whether and when the tender will happen. The previous tender documents give the term and any options to extend or renew, and so how long the service can stay with the same supplier.

When it comes, compare the new scope with the old one line by line. New sites, new requirements or a different award criterion all cut what the incumbent's experience is worth. Legal questions about the procedure are for your adviser: this page isn't legal advice.

The challenger's sums: real volumes, start-up costs, margin

The costliest mistake a challenger makes is pricing on the tender's quantities, which are only the buyer's estimate. When part of your cost is fixed, every unit that doesn't materialise raises the cost of the rest.

Annual margin = real volume × (bid price − variable cost per unit) − annual fixed costs − start-up costs ÷ contract years

Run it on the tender's volumes, on volumes rebuilt from past data and on a low volume. If the margin only holds on the first, the price is wrong.

Signs that an incumbent's contract is up for grabs

Against an incumbent doing a good job, with the same tender as last time, be careful. Your chances rise when:

  • the tender has changed: new sites, new requirements, a different award criterion;
  • the buyer has criticised the service, with penalties or complaints;
  • the contract has grown or shrunk a lot, and the incumbent's set-up no longer fits;
  • the quality score rewards proposals that can be written well without having run the service.

If plenty of firms are challenging, the incumbent isn't your only rival (how many bids a tender will get); the final sum is the one in bid or no bid.

If the contract is yours: how a safe-looking tender gets lost

The incumbent's risk is treating the new tender like a renewal.

  1. Price it from scratch

    Real volumes and today's costs, not last time's price with a tweak: bid like someone who doesn't know and you waste your edge.

  2. Write for a panel that doesn't know you

    The panel scores the documents. A copied proposal earns the marks of the last tender.

  3. Bring the evidence

    Punctuality, complaints closed, inspections passed, in figures.

  4. Answer the criticism

    If the buyer has raised a problem, say how you fix it before the challenger does.

Your price comes from the same sum as anyone else's (how low to bid); where quality is scored, the price scoring formula weighs in too.

What VIDI estimates on a tender with an incumbent

VIDI works on what you can see from outside. From similar closed tenders it estimates, with a range, how many bids will arrive and what kind of firms take part; from real award notices it also reads who the incumbent is. It is the reference class approach.

your casedistant cases, left outsimilar closed cases
The estimate starts from similar closed tenders and adjusts for what is different in yours.

The document gives the estimates, the range, what would overturn them and how far to trust them. To use your own costs, an NDA is signed first (data and confidentiality). The service is under VIDI for public tenders.

Over 3 billion

Over 3 billion data points read from public registers, about 6 million cases for training.

Data on companies, accounts, tenders, grants and public projects. EE Partner's own count. How we measure

What no public data tells you about the incumbent

  • The incumbent's real volumes and costs aren't in public data: VIDI doesn't guess them.
  • Whether a criterion favours the incumbent is a legal question for your adviser, not an estimate.
  • With few similar tenders, the document says so and the range widens.

Common questions

Can a tender be written to favour the incumbent?
If a requirement or criterion looks tailored to the current supplier, put a clarification question before the deadline and have your legal adviser read the documents: it is a judgement on the specific case.
If I'm the incumbent, should I cut my price to keep the contract?
Not necessarily. You know the true costs: use them for a price that holds even if volumes fall. Cutting out of fear gives margin away; a rushed proposal written because “they know us” costs you more.
Is it worth challenging an incumbent who does a good job?
With a tender that matches the last one you need an edge of your own, such as lower costs or a base closer to the service. It gets more interesting when the scope changes or when the quality score can be won with a strong proposal.

Let's talk.