How low can you go before you lose money?
The first number you need is yours: the point below which the contract loses you money. That takes the full cost of the contract: labour, materials, plant hire and subcontractors, a share of overheads, financing if the buyer pays late, and a provision for the risks you can already see.
Maximum discount = 1 − (full contract cost ÷ estimated contract value)
Many bids are built backwards: start from last time's winning price, then squeeze the costs into it. Keep the cost of preparing the bid separate, because you pay it whether you win or lose.
Why the number of bidders changes the price you need
When price alone decides, the deepest discount usually wins, unless the rules exclude abnormally low bids. With two or three bidders, the most aggressive one often stays at a sensible price. With fifteen, one firm with lower costs or an empty order book is enough to drag the winning price down.
Who bids matters too: a buyer's regular suppliers know each other, and a large contractor in a small tender changes the maths. In construction and public works these differences count even between tenders of the same size. The expected number of bids is best read as a range, not a single figure.
Pricing mistakes that cost the most
- Copying the winning price from the last similar tender. It belongs to the most aggressive bidder, often the one who underestimated their costs: the winner's curse.
- Averaging winning prices without checking how many bids there were. Tenders with three bidders and with twenty don't share an average.
- Forgetting the award criteria. When quality is scored as well as price, one more technical point can be worth more than one more point of discount.
- Underestimating the abnormally low tender check. If your price looks abnormally low, the buyer will ask you to explain it, and can reject the bid if the explanation doesn't justify the price.
- Bidding for everything. Every bid costs days: spend them where the expected competition suits you.
The sum that weighs your odds against your margin
Every extra point of discount raises your chances of winning and cuts what you earn if you win. The best point sits somewhere in between, and it moves with the competition.
Expected value of a bid = probability of winning × margin if you win − cost of preparing the bid
The hard part is the probability. Nobody knows the chance a given price gives you, but you can estimate the competition and think in scenarios: few bids, full margin; many bids, a tight price or no bid at all.
What VIDI tells you before you bid
For every tender you send us, VIDI estimates how many bids to expect, with a range, what kind of firms tend to take part and whether the contract is likely to go to a small or mid-sized company. Each estimate says how far to trust it, what would change it and where it comes from. The service is described under VIDI Public Tenders.
The estimates come from similar tenders already closed, with the real outcome read from public tender data: the reference class method.
We don't give you the price as a figure: you choose it, with your floor and the expected competition in front of you. If you send us your own files, such as your bid history, we sign an NDA first (see data and confidentiality).
79.9%
On European public tenders, VIDI by EE Partner points to the right choice 79.9% of the time.
This figure is about choices on European public tenders, not the discount: VIDI gives no discount figure. The sample document shows what an answer looks like.
Where VIDI won't help you on tenders
- VIDI does answer “will we win?”, but there it doesn't beat the best statistical rule by a safe margin. The document says so.
- It doesn't know your costs better than you do: if the full cost is wrong, so is the floor.
- It doesn't assess your technical proposal or predict the panel's scores.
- On rare tenders there are few similar cases and the range widens; the document says so.
- It can't see what isn't in the data: a competitor in trouble, an agreement between firms, a rule that has only just changed.