Three rivals or twelve: what changes in your sums
When the lowest price wins, the winning price is the extreme case of the group. The more firms bid, the likelier one has lower costs, stock to clear or a costing error. The winning price falls as bidders are added, but not in a straight line: two to five matters far more than twelve to fifteen.
The number also feeds your chance of winning. With four bids of similar strength, yours included, you start from one in four; with twelve, from one in twelve. Then adjust for costs, distance and how well you know the buyer. That is the core of the bid or no-bid decision.
If an uncertain cost is the same for everyone, such as timber prices up to delivery, whoever wins against many rivals has often priced it lowest. The more bids you expect, the more caution that item needs.
The EU public procurement directive asks a buyer to request explanations when a bid looks abnormally low, and to consult the bidder before rejecting it. With more bids on the table, a price far from the rest is usually easier to spot. See abnormally low bids and, for your own tender, your legal adviser.
What to read in the tender to see who will turn up
| Signal | More bids | Fewer bids |
|---|---|---|
| Value and lots | Small lots within reach of many | One large lot, high guarantees |
| Requirements | Turnover and track record asked in proportion | High specific turnover, very narrow past contracts |
| Subject | Catalogue products, standard sizes | Made-to-measure furniture, samples |
| Timing | Comfortable deadline, spread-out deliveries | A few days to bid, installation in a narrow window |
| Place and season | Near many manufacturers, quiet months | Remote area, the weeks when everyone delivers |
Two estimates that should meet: closed tenders and possible rivals
It pays to do both: if they disagree widely, the tender holds something you haven't seen.
Find the twin tenders
Same supply, value band, area and award criteria, similar buyers; the number of bids is in the results, where published. This is the reference class method.
Look at the whole spread
The lowest, the highest and where the middle half sits: a single figure hides the tenders with two bids and those with twenty.
Count the possible rivals
List the firms that meet the requirements and deliver to the area, then check how many of them actually bid for similar contracts.
Adjust and write down a range
Move the estimate with the signals in the tender and set a low, a credible high and a central case: a forecast range, to check against the outcome.
Expected bids ≈ firms able to bid × share that actually bids
Desks and chairs for three schools, counted twice
Common mistakes when counting your rivals
- Mixing up bids received and bids admitted: the price you have to beat is among those left.
- Mixing tenders split into lots with single-lot ones: where there are lots, count lot by lot.
- Forgetting firms from further away: a manufacturer from another region turns up when the contract pays for sending its fitters.
VIDI's estimate: where it comes from and what it tells you
For a tender you send us, VIDI estimates the range of bids to expect, the chance there will be few or many, and what kind of firms take part. It starts from similar closed tenders, with the real outcome read from public tender data. The document says how far to trust the estimate, what would overturn it and the sources. The service is described under VIDI Public Tenders; the sample document shows an answer.
Over 3 billion
Over 3 billion data points read from public registers, about 6 million cases for training.
You choose the price, with your full cost and the range in front of you, as the guide on pricing a tender bid explains. If you send us your own bid history, we sign an NDA first (see data and confidentiality).
When counting your rivals isn't enough
- Rare tenders, such as lab furniture: few similar cases, a wide range, and the document says so.
- Last-minute moves: a rival clearing stock or forming a consortium late doesn't show in the data.
- The number doesn't tell you who wins: knowing that four bids will arrive says nothing about which will be lowest.
- Legal questions: your legal adviser gives the right reading for your tender. This page is not legal advice.