How many tenders can you chase without winning too many?
A contractor prepares several bids a month, but the crews, the plant and the site manager stay the same. The risk few people mention is winning too many at once: a last-minute subcontractor paid over the odds, a site that slows down, delay damages.
Expected wins = sum of the probabilities of winning each tender
The probabilities come from the competition you expect on each tender, as the guide to tenders and bid pricing explains. Read them as a range and run the sum at both ends.
Why a profitable site can still run you out of cash
In construction, costs run ahead of income: you pay labour, plant hire and materials monthly, while the client pays on interim valuations, in its own time. Your cash need peaks just before the first payment, and two sites started together add their peaks. The peak moves with:
- how often valuations are made;
- the client's real payment days, from your past receipts, not the contract;
- any advance payment, and how it is recovered;
- retentions, if the contract provides for them, and when they are released.
A rule of thumb: with roughly flat monthly costs, every month the client pays late adds about one month of site costs to the cash you need. The full sum, with your other jobs and credit lines, belongs in a cash flow forecast.
You fix the price today and buy materials for the whole job
A bid is priced at today's rates. Steel, asphalt, concrete and energy you pay for when the site uses them, sometimes a year or two later. On a fixed price the difference is yours, and the usual mistake is leaving it out.
Margin lost ≈ materials' share of cost × price rise not covered by the contract
First read the price adjustment clause, if there is one: when it kicks in, which materials it covers, how much of the rise it returns. Then take the three or four heaviest items and think in scenarios: an unfavourable, a central and a favourable price, and the margin left in each.
What a contractor can ask VIDI
Useful questions, each tied to a decision and a deadline:
- “Will this tender draw three bids or fifteen, and from what kind of firms?”
- “Of these four tenders, which are most likely to go to a small or mid-sized firm?”
- “With material prices in three scenarios, how much margin is left on this contract?”
You bring the question and the files you have, such as your bid history; we sign an NDA before receiving them (see data and confidentiality). VIDI estimates from tenders already closed, with the real outcome, and you get a document with the range, the scenarios and how far to trust it. The tender service is under VIDI Public Tenders, and the sample document shows how an answer is laid out.
79.9%
On European public tenders, VIDI by EE Partner points to the right choice 79.9% of the time.
This figure covers choices on European public tenders, not the rest of this page. It doesn't apply to the bid discount, which VIDI doesn't give as a figure, nor to materials and cash: there the document says each time how far to trust the answer.
What VIDI can't see on a building site
- It doesn't estimate your site costs, check the bill of quantities or assess your technical proposal.
- It can't see the ground, buried services, client changes or late permits: the surprises that often decide the margin.
- On the bare question “will we win?”, it is no safer a bet than the best statistical rule, and the document says so.
- On rare works, such as a bridge or a listed building, few similar tenders have closed and the range widens.
- On private work there are no public award notices: the data to start from is thinner, and the document says so.