Why are business plans always too optimistic, and what can you do about it?

Plans come out optimistic because their authors see the project from the inside, where every step looks doable, and because almost everyone around a plan gains from a high number. The fix is to look outside: past plans against actual results, and similar closed cases. VIDI by EE Partner estimates the figures a plan rests on, with probabilities and ranges.

Why does a plan miss on the high side more often than on the low?

Whoever writes a plan describes how things go if everything follows the project. Daniel Kahneman and Amos Tversky call this way of reasoning the inside view: you start from your own case, without asking how things went for people who did something similar. The result is called the planning fallacy.

There is also an asymmetry. A new model can reach the shops a few weeks early, never six months early; six months late, easily. When nearly all the possible surprises sit on one side, errors do not cancel each other out, and the overshoot builds up.

Who around the plan gains from a high number?

Studying large infrastructure projects, Bent Flyvbjerg showed the error is not only psychological and called it strategic misrepresentation: low costs and high benefits get a project approved. In a company it happens daily, rarely in bad faith: the sales director knows a low budget looks unambitious, the founder that a flat plan attracts no investors, the borrower that the bank wants to see repayments covered.

There is also a selection effect. Approve the best three projects out of ten and you also approve the most overestimated: even honest estimates give optimistic approved projects. This applies to a business plan for a grant competing with other applications.

Four likely assumptions can add up to an unlikely plan

A plan rests on a few assumptions that must all come true. Each looks reasonable alone, but the arithmetic has to be done on all of them together.

Probability that all hold = p1 × p2 × p3 × p4

If the assumptions are independent, four that each come true seven times in ten hold together less than one time in four. If they are linked the probability can be higher, but the damage arrives at once: one late supplier hits launch, sales and receipts in the same month.

Write down the assumptions that carry the plan, give each a probability and a forecast range, and see what one failure does to the numbers.

Which lines of a plan tend to hide the optimism?

  • Full revenue from month one, as if the product were on the shelf at launch.
  • Prices held while volumes rise: selling more usually means discounting.
  • Fixed costs that never move, though more volume needs more storage and people.
  • Receipts at contract terms, not when customers actually pay.
  • No contingency line at all.

Six thousand e-bikes: what the record of past plans says

SeasonBikes in the planBikes soldSold per bike planned
Three years ago3,8003,3000.87
Two years ago4,6003,7000.80
Last year5,0004,2000.84
The plan record of the invented company in the example: the gap always runs the same way.
the rangethe numbercredible lowcredible high
Look at where the plan's figure falls: on the upper edge of the range, fixed commitments belong on the lower part.

What to do, in practice, about an optimistic plan

  1. Keep a record of your plans

    Planned and actual, never rewritten afterwards. In a few years you see whether you always miss the same way; the guide on forecast error shows how to measure it.

  2. Look outside

    Compare the plan with how similar companies fared, failures included: these are reference classes.

  3. Keep the target and the forecast apart

    The target drives the team; the forecast drives orders, hiring and debt. Write both down.

  4. Tell the story of the failure before it happens

    Ask whoever wrote the plan: “A year has passed and it went badly. Why?” The causes come out more easily.

  5. Tie rigid commitments to the cautious scenario

    Firm orders, permanent hires and repayments on the lower part of the range; options and staggered deliveries above it.

  6. Correct only where the record says so

    A flat cut on every plan punishes the careful project as much as the inflated one.

What VIDI can do with an overly optimistic plan, and what it cannot

You bring EE Partner the plan and the question that matters, such as how many bikes you will really sell. VIDI estimates the figures the plan rests on with probabilities and ranges, from closed cases with real outcomes and your own data, and states how far to trust them. See the sample document. An NDA is signed before any files change hands, as the guide on data and confidentiality explains.

The limits. VIDI cannot tell whether a number was inflated on purpose. For a product nobody has sold before, similar cases are few, the range stays wide, and the document says so. The document does not say whether your plan will succeed. It says how likely, in similar closed cases, the figures the plan rests on were to come true. More uses on the page about business decisions.

Common questions

What is the planning fallacy?
It is the habit, described by Kahneman and Tversky, of estimating a project's time, cost and results by looking only at the project itself, even when you know past projects went worse than expected.
Is an optimistic plan necessarily wrong?
No. An ambitious target can push a team. It becomes a problem when the same number drives orders, hiring and debt: there you need the most likely forecast, with its range.
How do I get an honest number from a sales director?
Keep the target, which the bonus is measured on, apart from the forecast, which orders and cash rest on. If the bonus does not depend on the forecast, a cautious number costs nothing.