Manufacturing: buy a machine, add a shift or subcontract the work?

In a manufacturing business the hard decisions keep coming back: buy a machine, add a shift, make in-house or subcontract, how much material to hold. They are decided by the hours you will actually fill and by the work your customers will bring, not by nameplate capacity. VIDI by EE Partner estimates that work with a range and scenarios; the choice stays yours.

Five factory decisions and the sum behind each one

DecisionThe sum that decidesThe usual mistake
Buying a machineHours you will fill over several years against the extra fixed costsWorking from nameplate capacity
Adding a shiftExtra hours sold against staff, shift premiums, supervisionForgetting maintenance and quality control
Make or buyThe costs that really go awayComparing the subcontractor with full cost
Stocking up on raw materialExpected price against tied-up cash and leftoversWatching the price, not the orders
Pricing a long contractMaterials and energy over the whole termA fixed price with no adjustment clause
The most common decisions in a manufacturing business, the sum to do and the usual mistake.

A machine pays for itself with filled hours, not rated ones

The machine builder quotes nameplate capacity. You sell fewer hours: the machine stops for changeovers, breakdowns and maintenance, runs slower on some parts, and some parts are scrapped. On the shop floor this is OEE, overall equipment effectiveness.

Saleable hours = available hours × performance × good parts out of total

Available hours: shift time minus stoppages and changeovers. Performance: actual speed over rated speed. Measure all three on the similar machine you already run, not from the brochure.

Then find the bottleneck. If the constraint is inspection, painting or the setters, a second machine upstream only fills the work-in-progress store. And smaller batches mean more changeovers: you need more capacity even for the same number of parts.

Night shift or second machine: the sums side by side

favourablecentralunfavourabletodaythe data you have
Look at the downside scenario: the option that loses least when orders drop is often the easiest to undo.

Make or buy: which costs actually disappear?

  • Overheads stay when a part goes out. Compare the subcontractor's price only with the costs that really go: material, energy, tooling, the hours of people you can redeploy.
  • Count the costs that are not in the price: transport, goods-in inspection, stock to cover the subcontractor's lead times.
  • A process outsourced for years is hard to bring back: the people who knew how to do it leave too.

How much work will your customers bring next year?

Component makers see sharper swings than the firms selling the finished product. When end demand slows a little, each link in the chain runs down its stock before reordering, so the supplier at the end feels it later and harder. This is the bullwhip effect, and it is why today's order book says little about the second half of the year. Look instead at:

  • confirmed orders month by month, kept apart from customer forecasts;
  • how much of their past forecasts turned into real orders;
  • your customers' own market: industrial production and producer prices for their sector from national statistics, and the accounts they file;
  • how much your top three customers weigh on margin.

From this you build a sales forecast with its range, then a cash flow forecast for the lean months. On long fixed-price contracts, a clause tied to a public index at least partly protects you from rising materials and energy costs; for a list price rise, see raising prices.

What VIDI does with a manufacturer's question

“Should we buy the machine?” becomes smaller questions: how much your customers will order, what materials and energy will cost, how many hours you will sell in each scenario. VIDI draws on billions of data points from public registers and millions of closed cases, with the real outcome, and looks among them for the ones closest to yours: the reference classes.

your casedistant cases, left outsimilar closed cases
Closed cases like yours and how they actually turned out: the estimate starts there, then your own data corrects it.

From your files we need turnover by customer and month, open orders, department hours, and material and energy costs; an NDA is signed before we receive them (see data and confidentiality). The document gives the expected hours with their range, the scenarios, what would overturn the answer and how far to trust it. The service is described under VIDI Business Decisions.

71.6%

On complex market questions, the path VIDI by EE Partner pointed to worked 71.6% of the time.

320 multi-part questions from European companies on prices, sales, business confidence and costs in the months after the question. Whether a path worked is decided on country and sector data, not on the accounts of the single company. Internal tests by EE Partner. How we measure

What VIDI can't tell you about your production

  • It doesn't schedule production or measure how efficient your machines are: you hold those figures.
  • If one customer is half your turnover, VIDI tells you what happens if they stay and if they go, not what they will decide.
  • For a new process, with no history and no similar businesses, the range stays wide, and the document says so.

Common questions

Is it better to buy the machine or lease it?
That depends on your cash, interest rates and the tax relief in force, which is a question for your accountant. The hours come first: if the machine won't be filled, no way of paying for it makes it worthwhile.
We work to order and every job is different. Can it still be estimated?
Yes, by reasoning in department hours and families of jobs rather than individual parts. The range is wider, and the document says by how much.
Our main customer sends us its forecasts. Aren't they enough?
They are useful but bind nobody. Compare them with what that customer actually ordered in past years: if its forecasts have often run above its orders, the same goes for today's.
Will VIDI tell me which machine to buy?
No, the technical choice stays with your engineers and the machine builders. VIDI estimates how much work will come in and whether the investment holds up in the downside, central and upside scenarios.